Big Names Trust G&P Construction

We've worked on some of the largest commercial projects in the country and are trusted by the biggest names across many industries.
Our professionals can handle any scope you can throw at us and deliver on time with maximum quality and satisfaction.

Meet and connect with our team here, call us at +1 (855) 494-4832, or quickly email us here.

Facility Relocation Project

133,000 SQ FT
Construction
Project Management
Tear Down
Removal of clients MHE system to transfer to a new facility. G&P will perform the work on an expedited schedule to accomplish client timelines.

Zulily DC Decommission

737,000 SQ FT
Liquidation
White Box
Tear Down
Permitting
G&P Construction at it once again, transitioning a former Zulily E-Commerce fulfillment center in Lockbourne, OH. Call us today to learn more about the opportunities this facility’s quality Material Handling Equipment can provide for your operations. This prime location in the heart of Lockbourne, OH’s industrial can be reimplemented using your WMS system or Equipment can be re-located into one of your current operations.

Zulily DC Decommission

750,000 SQ FT
Liquidation
White Box
Project Management
Located in the growing market of Reno NV, G&P is Liquidating another state-of-the-art Zulily distribution Center. Decommissioning a massive 3 level pick module, pallet racking, and MHE. All assets from pick module to totes must be sold. Contact us today for more information.

Bed Bath & Beyond DC, Las Vegas

188,950 SQ FT
Liquidation
White Box
Tear Down
Project Management
Our professionals are quickly decommissioning this massive state-of-the-art facility. This former Bed Bath & Beyond operating has an enterprise Pick Module, tons of quality MHE for repurpose, various types of pallet racking, and lots of miscellaneous items for pick & pack, shipping/receiving, peripherals, and more.

Ingram Micro

Installation
Installed 160 Rails of Pallet Flow.
Customers provided with the blueprint didn’t have the dimensions needed for installation, so the decision was made to measure off existing rails and continue the pattern. After installing 38 rails, we noticed the existing rails were installed incorrectly, causing our rails to be crooked. We measured off the column in the aisle to ensure that our rails were installed correctly. Customer had 8 extra rails that they wished to install themselves in the future if needed. I did a walkthrough with our contact (Robert Aldorasi) and he was very happy with the installation. Due to not having a physical copy of the print I was not able to get a sign off. He said he will email Jake his sign off.

Distribution Center Close Down

607,000 SQ FT
Construction
White Box
The transition of another former Bed Bath & Beyond fulfillment center in Port Reading, NJ. Tons of quality material handling assets and equipment for resale. Property can be turn-key, move in ready for potential tenants immediately. Call us to learn more about this prime commercial space and great deals on quality equipment.

Zulily DC Decommission

850,000 SQ FT
Liquidation
Construction
Installation of 187,000 sq ft Pick Module System that holds over 440,000 SKUs/Locations into an impressive 1,047,184 Square Foot warehouse. The customer is a known global fashion brand. The company specializes in private label brand fashion clothing, with over 36,000 products.

Enterprise e-Commerce Pick Module

1,047,000 SQ FT
Construction
Installation
Material Procurement
Design and Engineering
Permitting
Project Management
G&P Construction and Ziglift engineered, designed, permitted, and installed a 187,000 sq ft Pick Module System that holds over 440,000 SKUs/Locations. The customer specializes in fast fashion clothing and is a global brand.

Wheel Pros - Nashville, TN Trailer Division Warehouse

93,000 SQ FT
Installation
Material Procurement
Design and Engineering
Permitting
Our client launched a new distribution center, centrally located for their new after market trailer accessories division. We provided a turn-key solution for this high-density very narrow aisle selective rack application from design, engineering, permitting and installation.

Toys R Us Decommission

8,000,000 SQ FT
Construction
Liquidation
White Box
Tear Down
Over 8 million square feet of space located in warehouses across the US was “White Boxed”, providing a vast and versatile area for future use. Approximately 20 miles of conveyance systems were dismantled, ensuring the space was cleared and ready for new installations. All existing assets were removed and liquidated, streamlining the project site. The electrical system was expertly cut, capped, and removed, making way for new infrastructure. To enhance security, a new system was installed, providing robust safety measures. The sprinkler system was fully restored, ensuring compliance with fire safety standards. Additionally, the warehouse floor was restored and upgraded with a new epoxy finish, significantly improving its durability and appearance.

Pier 1 Large-Scale Liquidation

2,900,000 SQ FT
Liquidation
White Box
Construction
A major transition and decommission of facility for another large retail distributor. This is the first of many projects to complete all of the company-wide objectives for this customer. Over 2.9M SF of warehouse space between three locations across the US received the “White Box” treatment. 10,000 bays were dismantled and decommissioned. All assets were removed and liquidated, and the electrical systems were cut, capped, and removed. The warehouse floor was epoxied and restored, and all buildings were returned to the owner's specifications.

Sears K-Mart Decommission

8,700,000 SQ FT
Liquidation
White Box
Tear Down
Over 8.7M SF of warehouse space between six locations across the US received the “White Box” treatment. Each location was completed efficiently within a 15-week timeframe. In total 90 miles of conveyance, 13 sorters, over 100,000 positions of selective rack, and 12 pick modules were decommissioned. All assets were removed and liquidated, and the electrical systems were cut, capped, and removed. The warehouse floor was epoxied and restored, and all buildings were returned to the owner's specifications.

You're in Trusted Hands

There's no size or complexity we can't handle as we roll through one monumental project after another, year after year.
Look at the household names we've navigated seemlessly through massive transitions and rapid growth.